Four Lane Highways are being built at 3000 km a year. Under UPA-2, 24,425 kms highways were built versus 31,000 in 4 years of NDA. By March-end, the figure will touch 39,000 kms (60% more than UPA-2). Gadkari’s work has born fruit.
The Hormuz closure wasn't a miscalculation — it was the missing piece. With maritime routes uninsurable and IMEC the last corridor standing, Trump has seized control of global trade infrastructure through a private governance body accountable to no one but its chairman for life.
India's Ujjwala Yojana gave 100 million poor women clean cooking fuel and changed rural life forever. But every cylinder traveled through a single 33-kilometer strait. No reserve was built. No alternative was prepared. When Hormuz closed, the real catastrophe unfolded.
Examination infrastructure provided by TCS has shown to be compromised by groups within and from outside. It is time to consider these companies as "National Champions" and brought under proper security regulations.
Four years. Nine FIRs. A Malaysia-linked handler. A WhatsApp targeting dashboard. And a company that holds the keys to JEE, NEET, and India's banking exams. Is TCS Nashik case merely a workplace scandal? No. It is organized civilizational and economic warfare against Hindu India.